DutchAgriTechRequest budget direction
HomeModelsCropsProjectsTechnologyCompareFeasibilityProgramsInvestorsBudget direction

Complete greenhouse production package

Define the operating system—not only the greenhouse shell.

A DutchAgriTech package connects the greenhouse to crop water, climate, crop work, service areas, post-harvest flow and the people responsible for operation. Every proposal must also state exclusions, local works and evidence still required.

Request scoped budget direction
01

Greenhouse envelope

Structure, covering, ventilation, doors, screening and structural interfaces configured for the site and crop.

02

Crop-water system

Source, storage, filtration, treatment, irrigation, fertigation, drainage and recirculation as required.

03

Crop-working system

Growing method, plant support, access, hygiene, harvesting and material movement.

04

Climate and controls

Passive or active climate equipment, sensors, controls, alarms, energy interfaces and continuity provisions.

05

Service and post-harvest

Technical rooms, staff facilities, packing, cooling, storage, waste and dispatch when included.

06

Delivery and start-up

Engineering, logistics, installation scope, commissioning, documentation, training and supported handover.

Scope discipline

“Turnkey” is not a useful word without boundaries.

A complete package can mean equipment supply, installed systems or a wider project that includes local construction and start-up. The final proposal should identify the design basis, supplied equipment, optional items, local responsibilities, installation split, commissioning, training, documentation, warranty basis, assumptions, exclusions and validity.

Land, permits, foundations, utilities, roads, drainage, taxes, duties, local labour, financing and working capital may remain outside the supplier scope unless explicitly included. Recording these boundaries prevents an attractive equipment figure from being mistaken for the total capital required to start production.

Included
Named equipment, engineering, services and deliverables inside the commercial offer.
Optional
Technologies or infrastructure priced separately and selected only when justified.
By others
Local works, approvals, services or purchases assigned to the owner or another contractor.
To be verified
Inputs that can change design, price, schedule or performance before contract.

Package planning guide

Greenhouse Prices & Investment Scope

Understand what determines greenhouse price, complete-project investment and the assumptions required for useful budget guidance.

Read the guide

Package planning guide

Greenhouse Water, Irrigation & Fertigation

Plan source water, storage, treatment, irrigation, fertigation, drainage and recirculation as one crop-water system.

Read the guide

Package planning guide

Service Buildings, Packhouse & Cold Storage

Size technical, hygiene, packing and cold-chain spaces from staff flow, harvest peaks and buyer requirements.

Read the guide

Package planning guide

Greenhouse Installation, Commissioning & Training

Define site readiness, installation responsibilities, commissioning evidence, operator training and supported production start-up.

Read the guide

Before scope and price

Bring the facts that shape the complete package.

The first qualification should reveal what can be defined now, what requires feasibility or engineering, and which local responsibilities still need an owner.

Next decision

Compare scope before comparing price.

A defensible project starts with one coherent production brief and a transparent responsibility matrix. The commercial offer can then show what DutchAgriTech supplies, what the owner provides and what still requires verification.

Prepare the project case